• All Current Projects
Project NameProject DetailsProject Status
50 Avenue in Calgary AltaLink is consulting with Calgary residents in the Britannia, Elboya and Windsor Park areas about proposed developments along 50th Avenue.  
AltaLink is currently working with an architect to develop potential options and is reviewing possibilities to determine the density of development that is appropriate in the area. AltaLink is also reviewing the options with the community Steering Committee, made up of members from Britannia, Elboya and Windsor Park. 

Consultation underway
901/925L and 929/932L Line Alteration AltaLink is proposing to raise transmission lines in the Rocky View County area to allow vehicles transporting high loads to safely pass under the lines. This project includes: 
  • replacing four existing transmission line structures with taller ones
  • adding two new transmission line structures  

 

Consultation underway
908L and 904L transmission line projects AltaLink is upgrading its transmission system in the Edmonton area to make sure that a reliable supply of electricity is available for years to come. This project includes: 
  • 12 kilometres of new transmission line
  • rebuilding 50 kilometres of existing transmission line
Construction underway 
508L Airbreak Addition project AltaLink is upgrading its transmission system in the Stirling area to maintain the safety and reliability of the electric system in the area. This project includes: 
  • approximately 25 metres of new transmission line
Construction complete
In This Section
Projects
Rewarding Careers at AltaLink
Rewarding Careers at AltaLink
At AltaLink, we are doing everything in our power to attract the best and brightest.
Did You Know?
Workplace Safety at AltaLink
Since the energization of AltaLink's southwest 240 kV transmission line, Albertans now have access to twice as much clean, green wind power.