The routes in this map are only preliminary. None of these options have been approved. If the project is approved, only one line will be built.
AltaLink is currently completing public consultation for this project and wants your input to identify the lowest overall impact location for the proposed transmission line and substation.
The Etzikom Coulee to Whitla Transmission Project is part of an area transmission development called the Southern Alberta Transmission Reinforcement (SATR). This reinforcement includes new transmission lines and upgrades to the electric system in southern Alberta. These projects will connect new wind-generated power to Alberta’s electric system and strengthen the transmission system in the area.
The proposed project includes:
| Project schedule | |
|---|---|
| Winter 2012 | File application with the AUC |
| Fall 2013 | Start construction if project is approved |
November 2011
February 2011
January 2011