• Southern Alberta Transmission Reinforcement

Etzikom Coulee to Whitla Transmission Project

The routes in this map are only preliminary. None of these options have been approved. If the project is approved, only one line will be built.

Project overview

AltaLink is currently completing public consultation for this project and wants your input to identify the lowest overall impact location for the proposed transmission line and substation.

The Etzikom Coulee to Whitla Transmission Project is part of an area transmission development called the Southern Alberta Transmission Reinforcement (SATR). This reinforcement includes new transmission lines and upgrades to the electric system in southern Alberta. These projects will connect new wind-generated power to Alberta’s electric system and strengthen the transmission system in the area.

 

Project details

The proposed project includes:

  • A new substation, to be called Journault Substation.
  • A new 240 kV (240,000 volts) double circuit transmission line approximately 75 kilometres in length from the proposed Whitla Substation to the proposed Journault Substation.

Anticipated project schedule

Although we attempt to follow the anticipated project schedule it is subject to change. We will continue to provide you with updated schedule information as the project progresses.

 

Project schedule
Winter 2012 File application with the AUC
Fall 2013 Start construction if project is approved

Newsletters and maps

November 2011 

February 2011 

January 2011 

In This Section
Projects
Rewarding Careers at AltaLink
Rewarding Careers at AltaLink
At AltaLink, we are doing everything in our power to attract the best and brightest.
Did You Know?
Workplace Safety at AltaLink
The average elementary school in our province uses 21,250 kilowatt hours (kWh) of electricity a month. That's more than a city block of 20 houses uses in a month.