• Southern Alberta Transmission Reinforcement

Fidler Substation and Transmission Line

The routes in this map represent potential route options. If the project is approved, only one line will be built.

**If you are looking for the Fidler to Chapel Rock Transmission Project, please click here.**

Project overview

AltaLink began public consultation for this project in November 2009. We suspended work in December 2011 and waited for further direction from the Alberta Electric System Operator (AESO). We received direction from the AESO to resume work on the project and have filed our facilities application with the Alberta Utilities Commission (AUC).

 

Project details

The proposed project includes:

  • building a new substation northeast of the Town of Pincher Creek
  • building approximately five to nine kilometres of new 240 kV transmission line
  • reconfiguring and removing some sections of existing transmission lines in the area

Anticipated project schedule

Although we attempt to follow the anticipated project schedule it is subject to change. We will continue to provide you with updated schedule information as the project progresses.

Project schedule
Summer 2012 Notify and consult with stakeholders about preliminary routes
Fall 2012  File application with the AUC
Fall 2013  Start construction if project approved  

Newsletters and maps

November 2012 

July 2012 

December 2011 

May 2010 

April 2010 

November 2009 

In This Section
Projects
Rewarding Careers at AltaLink
Rewarding Careers at AltaLink
At AltaLink, we are doing everything in our power to attract the best and brightest.
Did You Know?
Workplace Safety at AltaLink
A reliable transmission system keeps costs low by connecting diverse sources of power generation to the grid.