• Southern Alberta Transmission Reinforcement

Overview

The Alberta Electric System Operator (AESO) has identified the need to reinforce the transmission system in southern Alberta. Alberta’s electrical grid needs more capacity to make room for power generated from new wind farm projects proposed throughout southern Alberta. New transmission lines and substations are required to support this growth and collectively these projects make up the Southern Alberta Transmission Reinforcement (SATR).

The AESO filed the need for the SATR in a formal application known as a Needs Identification Document (NID) with the Alberta Utilities Commission (AUC) in December 2008. The AUC is a quasi-judicial agency established by the Alberta government that ensures the fair and responsible delivery of our utility services. The AUC completed a public hearing in Lethbridge to review the need for these projects on June 22, 2009. The AUC approved the need on September 8, 2009.

The SATR is a series of transmission projects that will reinforce and strengthen southern Alberta’s electrical grid.

Illustrated Guide to the Southen Alberta Transmission Reinforcement

Click here for more information on the Southern Alberta Transmission Reinforcement.






The current SATR projects include the following:

Additional projects have been outlined in later stages of SATR and more information will be available in the future.

To learn more about the need for this project, please visit the AESO website.

Other Projects in Southern Alberta:

Each of these projects plays an important role and more details can be found on the specific project pages of this website as the projects develop.

 

In This Section
Projects
Rewarding Careers at AltaLink
Rewarding Careers at AltaLink
At AltaLink, we are doing everything in our power to attract the best and brightest.
Did You Know?
Workplace Safety at AltaLink
Since the energization of AltaLink's southwest 240 kV transmission line, Albertans now have access to twice as much clean, green wind power.