Bowmanton to Whitla Transmission Project

The Alberta Utilities Commission (AUC) approved the project in June 2011. Construction began in summer 2011 and the project was energized in March 2014.

The Bowmanton to Whitla Transmission Project (formerly known as the East Medicine Hat to Whitla Project) is part of an area transmission development called the Southern Alberta Transmission Reinforcement (SATR). This reinforcement includes new transmission lines and upgrades to the electric system in southern Alberta. These projects will connect new wind-generated power to Alberta's electric system and strengthen the transmission system in the area.


The project includes:

  • a new transmission line from the proposed Bowmanton Substation east of Medicine Hat to south of Whitla
  • a new substation located south of Whitla (Whitla Substation)

Project Status:
complete

Anticipated Project Schedule

Summer 2011 Start Construction
Spring 2014 Complete Construction

Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.

Subscribe to Updates

Back to Project Map Back to Project Listing