AltaLink is proposing to remove some of TransAlta’s equipment that is no longer required at the existing Peigan Substation.

The Peigan Substation is located on the Piikani Reserve No. 147, approximately 15 kilometres northeast of the community of Brocket.

We are proposing to remove two circuit breakers that are no longer required.