AltaLink is proposing to connect Renewable Energy Services Ltd.'s McLaughlin Wind Farm to the electric system.
This project includes:
- constructing 20 metres (65 feet) of new transmission line
- modifying an existing transmission line
- installing fibre optic cable in three locations
- November 2018
- AESO need overview update
- Project update
- Detail photo map 4
- January 2016
- Notice of application filing
- May 2015
- Newsletter
- Detail photo map 1
- Detail photo map 2
- Detail photo map 3
- AESO need overview