The Picture Butte to Etzikom Coulee Transmission Project is part of an area transmission development called the Southern Alberta Transmission Reinforcement (SATR). This reinforcement includes new transmission lines and upgrades to the electric system in southern Alberta. These projects will connect new wind-generated power to Alberta's electric system and strengthen the transmission system in the area.
The proposed project includes:
- upgrading the approved Picture Butte Substation
- building a new 240 kV (240,000 volts) double circuit transmission line approximately 70 kilometres in length from the approved Picture Butte Substation to the proposed Journault Substation
The Alberta Electric System Operator (AESO) has determined that the construction milestone for this transmission project has not been met and has asked AltaLink to permanently stop all work. We will provide an update to stakeholders in early 2017 regarding this project.
- January 2017
- Project update letter
- AESO update letter
- December 2014
- Project update letter
- AESO update letter
- June 2014
- Project update letter
- AESO update letter
- August 2013
- Project update letter
- AESO update letter
- December 2012
- Volume 4 newsletter
- Detail base map
- detail photo map
- Stafford Reservoir crossing map
- Stafford Reservoir crossing image
- Structure workspace document
- May 2012
- Volume 3 newsletter
- Detail base map
- detail photo map
- November 2011
- Volume 2 newsletter
- Detail base map
- detail photo map
- February 2011
- Open house information panels
- January 2011
- Volume 1 newsletter
- Detail base map
- detail photo map
- Regional base map
- Public involvement in needs or Facilities Applications
- Good neighbours
- A dialogue on electric and magnetic fields