Welsch Wind Power has requested a connection to the transmission system for their new wind farm development, Welsch Wind Farm. The Welsch Wind Farm can be connected by building a transmission line between the Welsch Wind Farm and the transmission system. The transmission line will be constructed, operated and maintained by AltaLink and will connect Welsch Wind Power’s approved Welsch Substation to the electric system.
- February 2019
- Project cancellation letter
- AESO Project Cancellation letter
- February 2017
- Newsletter: preferred and alternate routes
- Detail photo map
- Strip maps
- AESO need overview
- September 2016
- Newsletter
- Detail photo map
- Strip maps
- AESO need overview