Stirling Wind Project LP (SWLP) has requested a connection to the transmission system to connect the proposed Red Coat Substation, which is part of SWLP’s wind power project, to an existing AltaLink transmission line.
We are proposing to build approximately five to seven kilometres of 138 kilovolt (kV) transmission line. The final transmission line length is dependent on the final route selected, and approved, by the Alberta Utilities Commission (AUC).
- May 2019
- Notice of approval
- January 2018
- Notice of filing
- August 2017
- Project newsletter fibre optic
- Project map fibre optic
- Project newsletter transmission line
- Project map transmission line
- April 2017
- Project newsletter
- Project map
- AESO need overview