AltaLink is proposing to rebuild a section of the existing 786L transmission line. This section of line exists on difficult terrain and must be rebuilt and relocated to maintain the safety and reliability of the electric system.
- January 2019
- Notice of Project Approval
- April 2018
- Notice of application filing
- Map
- September 2017
- Newsletter
- DP map
- DB map