Travers Solar Connection Project

Greengate Power Corporation has applied to the Alberta Electric System Operator for transmission system access to connect its proposed Travers Solar Project in the Lomond area.

This project will

  • Add one 240 kilovolt (kV) transmission line to connect the Facility to the existing 240 kV transmission line 1005L
  • Add or modify associated equipment as required for the above transmission developments

Project Status:
complete

Anticipated Project Schedule

May 2021 Start Construction
August 2021 Complete Construction

Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.

Subscribe to Updates

Back to Project Map Back to Project Listing

©2023 AltaLink