Enbridge Pipelines (Woodlands) Inc. has requested upgrades to the electric system for their new pump station as part of their Woodland Pipeline Extension project.
AltaLink is proposing the following modifications to the existing Enbridge Abee 993S Substation:
- installing one (1) 138/4.16 kV transformer
- expand the existing fenceline to the north by approximately 20 m x 60 m.
Project Status:
consultation
Anticipated Project Schedule
July 2021 | Start Construction |
December 2021 | Complete Construction |