BHE Canada Rattlesnake G.P. Wind Power Connection

BHE Canada Rattlesnake G.P. (BHE Rattlesnake) is proposing to build a new substation and transmission line as part of their Rattlesnake Wind Power Project. To connect BHE Rattlesnake’s Project to the grid, AltaLink is proposing modifications to an existing 138 kilovolt (kV) transmission line (called 879L), located in SW-28-10-8-W4.


Project Status:
complete

Anticipated Project Schedule

May/June 2021 Start Construction
July 2021 Complete Construction

Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.