909L/1045L & 234L Transmission Line Modification

AltaLink is proposing to modify, replace, and relocate structures on the 909L/1045L and 234L transmissionlines in the Wabamun Lake area. Certain structures on these lines are reaching the end of their life cycle and need to be replaced. This project will ensure that the area continues to have a reliable source of electricity for years to come.


Project Status:
complete

Subscribe to Updates

Back to Project Map Back to Project Listing

©2023 AltaLink