AltaLink is proposing to install a new telecommunications towerinside the Pocaterra 48S Substation. The existing wood telecommunications pole at the Pocaterra 9048R Radio Site is aging and constructing a new tower will allow us to maintain the safety and reliability of the electric system in the area.
- December 2019
- Project newsletter
- Detail photo map
Project Status:
consultation
Anticipated Project Schedule
April 2020 | Start Construction |
October 2020 | Complete Construction |