76L Transmission Line Repair Work

AltaLink will be performing urgent repair work on a structure along the 76L Transmission Line near Pigeon Mountain Trail and Skogan Pass Trail on Wednesday, March 17. As a result, Skogan Pass Trail will be temporarily closed between 9 a.m. and 1 p.m. near Mount Lougheed View Point.

The structure is located in AltaLink’s right-of-way, near the Mount Lougheed View Point parking lot on George Biggy Sr. Road, approximately two kilometres southeast of Dead Man’s Flats. The work will take approximately eight hours to complete, beginning at 9 a.m.

On March 16, you may see AltaLink vehicles in the area as they drop equipment and materials off in preparation for the repair work. The equipment and materials will be located on the right-of-way, near the start of the Skogan Pass Trail.

We apologize for the inconvenience and appreciate your patience while we work to ensure the safety and reliability of the electric system in the area.


Project Status:
general-maintenance

Anticipated Project Schedule

March 2021 Start Construction
March 2021 Complete Construction

Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.