To connect Lathom Solar GP Ltd.’s (Lathom Solar) approved Lathom Solar Project to the grid, AltaLink is proposing upgrades to its transmission system in the area. AltaLink’s proposed project is located in the County of Newell, approximately 9.5 kilometres southwest of the Village of Rosemary.
AltaLink is proposing to:
- add one new structure on an existing 138 kilovolt (kV) transmission line (called 853AL), located in NW-30-20-16 W4
- install a new telecommunications tower within the approved Lathom Substation