Lathom Solar Project Connection

To connect Lathom Solar GP Ltd.’s (Lathom Solar) approved Lathom Solar Project to the grid, AltaLink is proposing upgrades to its transmission system in the area. AltaLink’s proposed project is located in the County of Newell, approximately 9.5 kilometres southwest of the Village of Rosemary.

AltaLink is proposing to:

  • add one new structure on an existing 138 kilovolt (kV) transmission line (called 853AL), located in NW-30-20-16 W4
  • install a new telecommunications tower within the approved Lathom Substation

Project Status:
cancelled

Anticipated Project Schedule

March 2023 Start Construction
July 2023 Complete Construction

Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.

Subscribe to Updates

Back to Project Map Back to Project Listing

©2023 AltaLink