Overview

AltaLink is proposing to relocate a portion of the existing 240 kilovolt (kV) transmission line (called 922L/926L) that is located in Parkland County in SW-17-52-4-W5. This portion of line is being affected by water and ice in the winter. There is currently no risk to public safety and electricity service, but relocating this portion will allow us to maintain the safety and reliability of the transmission line in the future.