To connect ABO Energy’s wind, battery and substation project to the grid, AltaLink had proposed modifications to an existing transmission line, construct a new switching station and install two new telecommunications towers. The project was located within the M.D. of Wainwright, approximately 20 kilometres south of the Village of Edgerton.