AltaLink has determined that the existing telecommunications pole and control building at the Big Horn Radio Site requires an upgrade. AltaLink is proposing to replace the telecommunications pole and control building as part of our ongoing equipment life-cycle maintenance program. The existing equipment has reached the end of its useful life. The proposed telecommunications upgrade will allow us to maintain the safety and reliability of the electric system in the area.