Overview

To connect Pembina Gas Infrastructure’s (Pembina) Kaybob South 3 Cogeneration Plant to the grid, AltaLink is proposing to build a new transmission line and install a new telecommunications tower. The new transmission line is proposed approximately 35 kilometres south of Fox Creek and the new telecommunications tower is proposed approximately 15 kilometres southeast of Fox Creek.

AltaLink’s proposed project includes:

  • Constructing approximately 650 metres of new 138 kilovolt (kV) transmission line to connect AltaLink’s existing Benbow 397S Substation, located in NE-15-59-18-W5, to Pembina’s proposed Kaybob South 1117S Substation, located in SE-15-59-18-W5
  • Installing a new telecommunications tower within AltaLink’s existing Fox Creek 347S Substation, located in NE-34-61-18-W5