Overview

Kiwetinohk’s proposed Homestead Solar Project is located in the Municipal District of Willow Creek, southeast of the Town of Claresholm.

Kiwetinohk is proposing a new transmission line that will connect its Homestead Substation to AltaLink’s existing transmission line (called 1037L). This is identified as the Proposed Customer Transmission Line on the maps in this package.

Kiwetinohk is considering two different connection points for this new line. One of the potential connection points is in SW-13-12-27-W4 and the other is in NW-12-12-27-W4. If approved, only one of these connection points will be used. 

Please see the detailed photo map(s) included in this package for more details.