Overview

To connect the Neyaskweyahk Group of Companies Inc. (NGCI) Kâpîsimotêt Solar Project to the grid, AltaLink is proposing changes to the transmission system. The project is located approximately five kilometres northwest of Maskwacis.

To accommodate the connection of the Kâpîsimotêt Solar Project, AltaLink’s proposed project includes:

  • modifying a structure on the portion of the existing 914L tranmission line owned by TransAlta (located at SW-18-45-24-W4M)
  • constructing approximately 120 metres of new 240 kilovolt (kV) transmission line to be named 914A
  • installing a new telecommunications tower at NGCI’s proposed Kâpîsimotêt 1058S Substation