To connect St. Albert Solar STL Inc.’s (St. Albert Solar), St. Albert Villeneuve Solar
project, to the grid, AltaLink had proposed to:
- construct between five to seven km of new 240 kilovolt (kV) transmission line (to be named 905AL) along one of four potential routes
- install a new telecommunications tower located within the Villeneuve 1040S Substation