To accommodate the Alberta Transportation and Economic Corridors (ATEC) Highway 3 twinning project, AltaLink is proposing to move, modify and replace structures along the 607L transmission line to allow for high load clearance. The proposed project is approximately 10 kilometres east of the town of Taber, in the Municipal District of Taber.