Overview

To connect Enfinite’s Hutchison Battery Storage Facility Project to the grid, AltaLink
is proposing to upgrade equipment at the existing Bowmanton 244S Substation. The
project is located approximately 18 kilometres northeast of the City of Medicine Hat
in NW-15-14-4- W4.

The proposed project will include:

  • adding a 240 kilovolt (kV) circuit breaker
  • adding or modifying associated equipment as required