To connect Aira Wind Power Inc’s (Aira) Aira Solar Project to the grid, AltaLink is proposing changes to its transmission system in the area.
The proposed project is located in Cypress County in NW-31-8-7-W4, approximately 35 kilometres southeast of the Town of Bow Island. It includes modifying an existing transmission line, constructing a new transmission line, and installing underground fibre optic cable.
- April 2023
- Project newsletter
- Detail photo map
- AESO need overview
Project Status:
consultation
Anticipated Project Schedule
September 2024 | Start Construction |
December 2024 | Complete Construction |
Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.

