Our Commitment
Grid Activity
Safety & Preparedness
In the Community

Overview

The Wabamun 2739S Substation and the connecting 124L transmission line were constructed in 1954 and are at the end of their life cycle. They are no longer needed in the area, so we are proposing to remove them.

The proposed project includes:

  • removing the Wabuman 2739S Substation, located in SE-10-53-4-W5
  • removing approximately 600 metres of transmission line connected to thesubstation

Subscribe to project updates

This site is protected by reCAPTCHA.
The Google Privacy Policy and Terms of Service apply.