The Wabamun 2739S Substation and the connecting 124L transmission line were constructed in 1954 and are at the end of their life cycle. They are no longer needed in the area, so we are proposing to remove them.
The proposed project includes:
- removing the Wabuman 2739S Substation, located in SE-10-53-4-W5
- removing approximately 600 metres of transmission line connected to thesubstation