Our Commitment
Grid Activity
Safety & Preparedness
In the Community

Overview

ENGIE Development Canada LP (ENGIE) has requested a connection to the transmission system for their proposed Duchess Solar Project.

AltaLink is proposing to construct a transmission line, operated and maintained by AltaLink, to connect ENGIE’s proposed Rock Lake Substation to the electric system by connecting it to an existing AltaLink transmission line in the area. The proposed project is located approximately four kilometers southwest of Duchess and will be operated and maintained by AltaLink.

Subscribe to project updates

This site is protected by reCAPTCHA.
The Google Privacy Policy and Terms of Service apply.