Georgetown Solar Project Connection

AltaLink’s proposed project is located approximately 8.5 kilometres south of the Hamlet of Carseland in SE-17-21-25-W4.

To connect the Georgetown Solar Project to the electric system, AltaLink’s proposed project includes:

  • adding one new structure on the existing 240 kilovolt (kV)transmission line (called 924L)
  • building approximately 150 metres of new 240 kV transmission line (to be called 924AL)
  • installing a new telecommunications tower within theMossleigh Substation located in NE-8-21-25-W4

Project Status:
consultation

Anticipated Project Schedule

January 2023 Start Construction
October 2023 Complete Construction

Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.