Wabuman Substation and 124L Transmission Line Salvage

The Wabamun 2739S Substation and the connecting 124L transmission line were constructed in 1954 and are at the end of their life cycle. They are no longer needed in the area so we are proposing to remove them.

The proposed project includes:

  • removing the Wabuman 2739S Substation, located in SE-10-53-4-W5
  • removing approximately 600 metres of transmission line connected to thesubstation

Project Status:
consultation

Anticipated Project Schedule

May 2023 Start Construction
November 2023 Complete Construction

Although we attempt to follow the anticipated project schedule, it is subject to change. We will continue to provide you with updated schedule information as the project progresses.

Subscribe to Updates

Back to Project Map Back to Project Listing